It isn’t going to be possible for a remodeling company to remodel a bathroom in your home overnight. In fact, it’s not going to be possible for them to do it in a matter of just a week or two in most cases. More often than not, bathroom remodeling in San Diego, CA is going to take at least four weeks on average and possibly even longer than that if your remodeling company runs into any unexpected issues. You should prepare for this by getting to know what the bathroom remodeling timeline will look like. Check it out below to get yourself ready for it.
Step 1: Bathroom remodeling planning and inspections (about 1 week)
When you first decide that you want to remodel a bathroom, you’ll have to bring a reputable remodeling company on board to supply you with experienced bathroom remodelers. You’ll also have to sit down with them to do the proper planning for your project. Additionally, you’ll need to have your bathroom inspected to make sure that a remodeling company can bring the ideas that you have for the space to life. This can take about a week for everything to come together.
Step 2: Demolition followed by plumbing and electrical work (about 1 week)
Once you have the plans in place for your remodeled bathroom, your remodeling company will spend about a day ripping your old bathroom apart. Then, they’ll make room for plumbers and electricians to come in to do their jobs. Generally speaking, they can typically work together at the same time, but your remodeling company might also choose to stagger their work schedules so that they’re not tripping over one another. They might be able to finish their jobs in under a week. But it could take up to a week for them to be done depending on what exactly they’ll be doing.
Step 3: New bathroom installation (about 2 weeks)
After plumbers and electricians finish up, that is when the real fun will begin in your bathroom. Your remodeling company will step in and start to breathe some life back into your bathroom space. They’ll do this by installing new plumbing fixtures, putting down new flooring, adding tiles to the walls, setting up cabinetry, and doing everything else that will need to be completed. This is often going to take at least a couple of weeks, but you could be looking at more time than that if you have a larger bathroom space.
Step 4: Cosmetic finishes to the remodeled bathroom (about 1 week)
At the tail end of a bathroom remodel, a remodeling company will put all the finishing touches on your revamped bathroom space. They’ll paint the walls, hanging light fixtures, and give your bathroom the finished look that you want. This can take up to a week, but it might not take that long in many instances. It’ll be based on how much a remodeling company still has left to do.
Do you want to get a better sense of what your specific bathroom remodeling timeline will look like? CALbath Renovations can give you some idea of what you’ll have to deal with when you hire us to do a San Diego, CA bathroom remodel for you. Call us today to see how we can help you build the bathroom of your dreams in no time at all.